Seasoned foreman with 21 years of experience and knowledgeable about scaffold and coal fired plants such as Keystone, Conemaugh and Shawville. I also have knowledge of operations of Cogens, Steel Mills, Oil Refineries, Chemical Plants, Natural Gas Plants and bridges of all building/operations. Offering top-notch project management, team leadership and problem-solving abilities. Ingenious in maximizing resources to meet challenging demands. Analytical leader with excellent multitasking abilities. Conveniently residence is located one mile from the Homer City Redevelopment Project. Enjoyed working hand in hand with Kiewitt Superintendents Joe Calcek, Dave Deneen, Bill Duane at the Hilltop Energy Project when I was a general foreman for scaffold from 2019-2021.
Overview
20
20
years of professional experience
Work History
Scaffold Construction Superintendent
Vertical Access Solutions/Fayetteville Energy
02.2025 - Current
Conducted daily site assessments to ensure safe working conditions for all team members.
Coordinated logistics for timely material deliveries, ensuring smooth project progression.
Continuously updated knowledge on industry trends, regulations, best practices to ensure compliance across all projects.
Managed multiple concurrent projects successfully while supervising teams ranging from 10-25 employees.
Consistently met or exceeded deadlines through effective time management strategies and prioritization techniques.
Developed customized scaffold designs to accommodate unique project requirements, resulting in successful completion of complex structures.
Optimized resource utilization by tracking inventory levels and coordinating equipment maintenance schedules.
Reduced safety incidents with strict adherence to OSHA guidelines and regular safety inspections.
Resolved onsite issues promptly, minimizing potential disruptions in project timelines.
Enhanced project efficiency by streamlining scaffold erection and dismantlement processes.
Improved overall cost-efficiency by conducting thorough material audits and implementing waste reduction strategies.
Mentored junior team members to enhance their skills and enable professional growth within the company.
Maintained detailed records of project progress, changes, and completed tasks for accurate reporting purposes.
Implemented innovative solutions that addressed unique challenges arising from various building types or locations.
Implemented quality control measures to maintain high standards of workmanship on all scaffolding projects.
Collaborated with project managers to develop accurate estimates and schedules, improving client satisfaction rates.
Conducted comprehensive training sessions for new hires on safety protocols and proper use of equipment before they were allowed onsite.
Facilitated clear communication between team members, clients, and subcontractors, fostering a collaborative work environment.
Increased customer satisfaction levels by maintaining open lines of communication regarding expectations, concerns, and updates regularly.
Ensured optimal crew performance by effectively managing personnel assignments and workload distribution.
Assembled, erected and dismantled scaffolding structures to meet project needs.
Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
Verified all scaffolding materials were stored safely and securely.
Followed OSHA regulations and safety standards when installing and working with scaffolding.
Assisted with tying off and securing scaffolding to building structures to optimize safety.
Worked in team-focused environment to collaboratively complete projects on time and within budget.
Safely installed and dismantled scaffolding from aerial lifts and larger lifts.
Built custom scaffolding structures to specifications for diverse applications.
Inspected scaffolding for safety and structural integrity before each use.
Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures.
Carried materials and equipment weighing up to 100 plus pounds onto job sites in various climates and weather conditions.
Worked around live machinery and ongoing operations to complete 10 scaffolding projects on-time and under budget.
Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.
Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
Tracked project costs and other financial metrics to maximize profitability.
Developed and implemented construction plans according to client specifications and expectations.
Established and maintained relationships with vendors to source affordable and high quality materials and equipment for construction projects.
Assisted in organizing and overseeing assignments to drive operational excellence.
Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
Implemented systems to improve process efficiency and reduce project duration.
Oversaw effective disposal of construction waste and implemented programs to increase use of recycled materials.
Scaffold General Foreman
Solid Platforms Inc./Clairton Steel Mill US Steel
05.2023 - 01.2025
Conducted thorough training sessions for new hires on safe work practices specific to scaffolding operations.
Optimized scaffold utilization by developing detailed erection plans, minimizing waste of materials and resources.
Reduced downtime on projects by effectively managing labor resources and ensuring timely completion of tasks.
Maintained excellent client relationships by addressing concerns promptly and providing exceptional customer service throughout projects.
Implemented cost-saving measures through efficient resource allocation and strategic planning of scaffold usage.
Enforced company policies regarding safety procedures and personal protective equipment use among workers onsite.
Increased project efficiency by coordinating with cross-functional teams to ensure smooth scaffolding installations and dismantling processes.
Ensured compliance with OSHA regulations, maintaining a safe work environment for all employees.
Facilitated smooth transitions between project phases by ensuring timely dismantling of scaffolds and seamless handoffs to other trade crews.
Facilitated communication between team members, fostering a collaborative work atmosphere that improved overall productivity.
Evaluated new scaffolding technologies and systems, incorporating innovative solutions that increased efficiency and reduced labor costs.
Mentored junior foremen, imparting valuable industry knowledge and best practices to the next generation of leaders in the field.
Adapted quickly to changing project requirements, demonstrating flexibility in adjusting plans accordingly without compromising safety or quality standards.
Streamlined inventory management practices, enabling accurate tracking of scaffold materials and reducing costs associated with lost or damaged equipment.
Developed comprehensive project schedules, ensuring timely completion while minimizing disruptions to ongoing operations at job sites.
Established strong vendor partnerships, negotiating favorable terms for equipment rentals and material purchases that resulted in significant cost savings.
Coordinated closely with project managers to develop accurate estimates for scaffolding needs on various construction sites.
Enhanced job site safety by implementing strict scaffold inspection protocols and conducting regular audits.
Assembled, erected and dismantled scaffolding structures to meet project needs.
Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
Verified all scaffolding materials were stored safely and securely.
Followed OSHA regulations and safety standards when installing and working with scaffolding.
Assisted with tying off and securing scaffolding to building structures to optimize safety.
Worked in team-focused environment to collaboratively complete projects on time and within budget.
Safely installed and dismantled scaffolding from aerial lifts and larger lifts.
Built custom scaffolding structures to specifications for diverse applications.
Inspected scaffolding for safety and structural integrity before each use.
Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures.
Carried materials and equipment weighing up to 100 pluspounds onto job sites in various climates and weather conditions.
Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.
Oversaw daily operations at site, keeping team production moving at optimal pace.
Inspected equipment and tools used for safe operation.
Trained workers in proper methods, equipment operation and safety procedures.
Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
Prepared and submitted reports on job progress and safety conditions to upper management.
Directed projects according to schedule and quality demands.
Provided feedback to workers on job performance and safety procedures.
Created and implemented plans to maximize efficiency of workers.
Administered disciplinary actions to workers violating safety regulations and company policies.
Supervised training of new construction and extraction workers on safety practices and procedures.
Supported construction and extraction workers to facilitate timely completion of projects.
Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
Investigated and reported on accidents, injuries and near-miss incidents.
Established and enforced safety regulations, procedures and standards for construction and extraction workers.
Documented construction and extraction workers' hours, wages and other pertinent information.
Devised and implemented safety protocols to reduce risks on construction and extraction sites.
Scaffold General Foreman
Brand Safeway Scaffolding
08.2021 - 03.2023
Conducted thorough training sessions for new hires on safe work practices specific to scaffolding operations.
Optimized scaffold utilization by developing detailed erection plans, minimizing waste of materials and resources.
Reduced downtime on projects by effectively managing labor resources and ensuring timely completion of tasks.
Maintained excellent client relationships by addressing concerns promptly and providing exceptional customer service throughout projects.
Implemented cost-saving measures through efficient resource allocation and strategic planning of scaffold usage.
Enforced company policies regarding safety procedures and personal protective equipment use among workers onsite.
Increased project efficiency by coordinating with cross-functional teams to ensure smooth scaffolding installations and dismantling processes.
Ensured compliance with OSHA regulations, maintaining a safe work environment for all employees.
Facilitated smooth transitions between project phases by ensuring timely dismantling of scaffolds and seamless handoffs to other trade crews.
Facilitated communication between team members, fostering a collaborative work atmosphere that improved overall productivity.
Mentored junior foremen, imparting valuable industry knowledge and best practices to the next generation of leaders in the field.
Adapted quickly to changing project requirements, demonstrating flexibility in adjusting plans accordingly without compromising safety or quality standards.
Streamlined inventory management practices, enabling accurate tracking of scaffold materials and reducing costs associated with lost or damaged equipment.
Developed comprehensive project schedules, ensuring timely completion while minimizing disruptions to ongoing operations at job sites.
Established strong vendor partnerships, negotiating favorable terms for equipment rentals and material purchases that resulted in significant cost savings.
Enhanced job site safety by implementing strict scaffold inspection protocols and conducting regular audits.
Assembled, erected and dismantled scaffolding structures to meet project needs.
Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
Verified all scaffolding materials were stored safely and securely.
Assisted with tying off and securing scaffolding to building structures to optimize safety.
Safely installed and dismantled scaffolding from aerial lifts and larger lifts.
Worked in team-focused environment to collaboratively complete projects on time and within budget.
Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures.
Built custom scaffolding structures to specifications for diverse applications.
Trained new employees on proper safety procedures for working on scaffolding.
Inspected scaffolding for safety and structural integrity before each use.
Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.
Trained workers in proper methods, equipment operation and safety procedures.
Inspected equipment and tools used for safe operation.
Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
Directed projects according to schedule and quality demands.
Provided feedback to workers on job performance and safety procedures.
Supported construction and extraction workers to facilitate timely completion of projects.
Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
Created and implemented plans to maximize efficiency of workers.
Scaffold General Foreman
Kiewit Energy
11.2019 - 05.2021
Oversaw daily work of 20-40 workers using knowledge of local and national building codes for all areas of construction
Troubleshooting operational problems
Optimized scaffold utilization by developing detailed erection plans, minimizing waste of materials and resources.
Conducted thorough training sessions for new hires on safe work practices specific to scaffolding operations.
Oversaw daily operations at site, keeping team production moving at optimal pace.
20 plus years of heavy equipment operating with training and experience Vertical Access | Pittsburgh, PA
Directed projects according to schedule and quality demands.
Reported to supervisors weekly regarding project progress, site problems and labor status
Supported construction and extraction workers to facilitate timely completion of projects.
Estimated time, employee needs and material costs for projects
Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
Planned and delegated work to meet planned project and production goals
Communicated with stakeholders on job milestones.
Supervised material usage and contractor hours to keep projects in line with budgets
Documented construction and extraction workers' hours, wages and other pertinent information.
Managed team member schedules and individual assignments for work crew
Inspected scaffolding for safety and structural integrity before each use.
Worked with suppliers to maintain material flow during all project phases
Built custom scaffolding structures to specifications for diverse applications.
Analyzed job sites daily to mitigate risks for workers and visitors
Safely installed and dismantled scaffolding from aerial lifts and larger lifts.
Planned and delegated work for multiple construction crews
Worked in team-focused environment to collaboratively complete projects on time and within budget.
Analyzed project details to ensure correct materials and equipment for job sites
Assisted with tying off and securing scaffolding to building structures to optimize safety.
Assembled, erected and dismantled scaffolding structures to meet project needs.
Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
Verified all scaffolding materials were stored safely and securely.
Enhanced job site safety by implementing strict scaffold inspection protocols and conducting regular audits.
Coordinated closely with project managers to develop accurate estimates for scaffolding needs on various construction sites.
Streamlined inventory management practices, enabling accurate tracking of scaffold materials and reducing costs associated with lost or damaged equipment.
Conducted daily site assessments to ensure safe working conditions for all team members.
Coordinated logistics for timely material deliveries, ensuring smooth project progression.
Scaffold Superintendent
Avalotis Corporation
03.2018 - 06.2019
Oversaw daily work of 12 plus workers using knowledge of local and national building codes for all areas of construction
Evaluated plans and inspected ongoing construction to keep work in line with project goals
Negotiated labor contracts with general contractors and subcontractors.
Managed multiple projects at the same time by coordinating materials, inspections and contractor tasks
Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
Provided consultants with current information about best practices and safety requirements
Analyzed and evaluated construction bids to select most cost-effective contractors.
Presented updates and reports measuring performance against benchmarks every week to the project manager and CEO
Collaborated with structural engineers to evaluate structural integrity of projects.
Managed safety of worksite and adherence to all OSHA regulations
Obtained building and specialty permits from local jurisdictional agencies.
Developed sustainable operational processes, plans and evaluation systems in collaboration with team members
Used computer software to design construction plans and perform calculations.
Established operational and educational plans with clear objectives and paths to achievement
Reduced costs by streamlining contract bidding and procurement processes to assure best prices for materials and services.
Managed projects to complete on schedule by working with specialized teams
Reviewed project blueprints and specifications to determine number of employee's needed to complete job
Supported budget and project goals by keeping balanced inventory
Prepared cost and inventory reports and maintained accurate records using company work order reporting system
Maintained payroll data, attendance records and delivered materials to job site on time and in good condition
Saved money by overseeing cost-effective material sourcing and effective work orders
Directed all production phases from initial estimate to final quality check and delivery
Authored and updated production reports and personnel records for use by senior managers in making accurate operational decisions
Provided stakeholders with information on job milestones
Uphold schedule requirements and quality demands with hands-on project supervision
Scaffold Foreman
Vertical Access
11.2016 - 02.2018
Reported to supervisors weekly regarding project progress, site problems and labor status
Estimated time, employee needs and material costs for projects
Planned and delegated work to meet planned project and production goals
Supervised material usage and contractor hours to keep projects in line with budgets
Managed team member schedules and individual assignments for work crew
Worked with suppliers to maintain material flow during all project phases
Analyzed job sites daily to mitigate risks for workers and visitors
Planned and delegated work for multiple construction crews
Analyzed project details to ensure correct materials and equipment for job sites
Scaffold Foreman/General Superintendent
Brand Infrastructures
10.2010 - 10.2016
Planned and delegated work for multiple construction crews
Coordinated schedules and day-to-day activities of crew to satisfy project needs
Supervised material usage and contractor hours to keep projects in line with budgets
Reported to supervisors weekly regarding project progress, site problems and labor status
Recorded supplies, parts, equipment and employee work hours for every job
Implemented onsite safety protocols and procedures and properly trained all team members on prevention measures, effectively reducing injuries by half
Assigned work to employees based on project requirements and individual team member strengths
Maintained high standards of safety, productivity and quality for every job
Analyzed job sites daily to mitigate risks for workers and visitors
Determined optimal construction requirements and site plans
Scaffold Foreman
Harsco Infrastructures
02.2008 - 09.2010
Assigned duties to each employee based upon his or her skills set and monitored progress daily
Complied with federal and company regulations to ensure that all job sites maintained high level of safety
Planned and delegated work to meet planned project and production goals
Coordinated regular preventive and predictive maintenance programs to maintain optimal equipment functionality
Reported to supervisors weekly regarding project progress, site problems and labor status
Communicated positively with employees, demonstrating high company standards and mitigating issues immediately
Directed all production phases from initial estimate to final quality check
Assigned staff, materials and funds throughout lifecycle of projects
Oversaw effective use of all department resources to maximize efficiency and achieve production targets
Worked with suppliers to maintain material flow during all project phases
Supervised material usage and contractor hours to keep projects in line with budgets
Analyzed project details to ensure correct materials and equipment for job sites
Maintained high standards of safety, productivity and quality for every job
Monitored parts and equipment used at job sites
Evaluated schedules, orders and forecasts to plan operational processes and meet timetables
Scaffold Erector
Patent Construction
02.2005 - 01.2008
Safely constructed hung, tube and clip and modular scaffolding systems
Removed and disassembled scaffolding and pieces weighing at end of each shift or project and loaded all materials into trucks
Designed new employee training program to share best methods for assembling and disassembling scaffolding
Safely and accurately built scaffolding in confined spaces like cooling towers
Safely assembled scaffolding in and around buildings for a variety of different projects
Operated machinery in busy environments and maintained safety around equipment, people and other projects
Maintained clean and organized workplace to optimize performance, efficiency and safety
Completed projects by assembling forms and building strong structures
Adhered to project blueprints and requirements to deliver quality work
Communicated with teammates and supervisors frequently to understand requirements and complete projects on time
Utilized various tools, equipment, materials and forming systems to complete construction tasks
Maintained site safety and aligned work with budget, schedule and applicable building codes
Reduced downtime during production by maintaining equipment and reducing unnecessary maintenance
Completed all repairs and maintenance work to company standards
Education
High School Diploma -
Elderton High School
Elderton, PA
06.2000
Skills
Extensive knowledge of scaffolding installation, maintenance, and inspection procedures to ensure safety and efficiency
Strong leadership skills to oversee and guide a team of scaffolding workers
Excellent communication and problem-solving skills to coordinate activities and communicate safety protocols
Construction scheduling
Blueprint reading
Subcontractor supervision
Blueprint interpretation
OSHA regulations
Construction management
Change orders management
Site safety management
Project budgeting
Materials procurement
Cost control implementation
Equipment inspection
Cost estimation
Cost analysis
Project cost estimation
Procurement management
Material management
Constructability review
Scaffold design
Site supervision
Scaffolding erecting
Hazard identification
Preventive Maintenance
Troubleshooting
Safety regulations
Rigging skills
Project planning
Team oversight
Operation Monitoring
Structural analysis
Timeline
Scaffold Construction Superintendent
Vertical Access Solutions/Fayetteville Energy
02.2025 - Current
Scaffold General Foreman
Solid Platforms Inc./Clairton Steel Mill US Steel
05.2023 - 01.2025
Scaffold General Foreman
Brand Safeway Scaffolding
08.2021 - 03.2023
Scaffold General Foreman
Kiewit Energy
11.2019 - 05.2021
Scaffold Superintendent
Avalotis Corporation
03.2018 - 06.2019
Scaffold Foreman
Vertical Access
11.2016 - 02.2018
Scaffold Foreman/General Superintendent
Brand Infrastructures
10.2010 - 10.2016
Scaffold Foreman
Harsco Infrastructures
02.2008 - 09.2010
Scaffold Erector
Patent Construction
02.2005 - 01.2008
High School Diploma -
Elderton High School
Similar Profiles
Andrew J. STEVENSONAndrew J. STEVENSON
Superintendent at Vertical Access SolutionsSuperintendent at Vertical Access Solutions