Accomplished Pipefitter/Welder with over 20 years of experience, including a pivotal role at JBS Beef Plant, enhancing system efficiencies and safety. Expert in blueprint reading and emergency repairs, I excel in project management and team collaboration, ensuring optimal operational standards and innovative solutions in commercial and industrial settings. Highly trained Pipefitter offering excellent skills in managing teams and running and cutting copper. Pursuing a similar position where a well-qualified individual with an understanding of assembling and installing pipe systems is highly sought. Competent Pipefitter offering a wealth of experience in fabricating and installing plumbing systems. Please note i have successfully completed both boiler maker apprenticeship and pipefitter apprenticeship 4 years apiece.
Mostly installed new fixtures in commercial and residential applications, most of this was plumbing and some boiler installations . In most commercial applications followed contractor's prints unless there were RFI needed which were always closely collaborated with engineering as well as owners and contractors. Always followed through with all safety rules made sure anyone working on that job also was safe day in day out.
Here at Pauls i was lead tech working on and maintaining customers homes and businesses installing new fixtures replacing boilers and installing new ones replacing piping for heating systems in commercial applacations for walmart and sams clubs as i was there only experienced team member with the right experiance to be able to follow through and get certain jobs myself talking with facility's mantaince managers getting solutions explaining those solutions to management so that that knew every step i took would cure them of those problems as well as future problems to come . i also took care of Pauls log time customer base to make sure they knew they were in good hands when it came to repairs .
Here i took care of the Energy center consisting of 5 steam boilers which operated the entire plants steam system and all its equipment, i made sure each boiler was in good operating working condition before each day had begun started every boiler and made sure all piping systems ran perfectly and were in good working condition . during weekends when the plant was down my crew and i would replace needed piping as needed welding as well as fitting piping in place to finish the job before the start of the week . we constantly took safety classes so that we would be doing our job safely as well as wearing all needed safety equipment while doing our job, as lead engineer and boiler operators i would generally take time to write up specifics and send them to my manager so that we would make time to make needed repairs to these boilers and there components