A HIGHLY MOTIVATED PROFESSIONAL WITH SOLID EXPERIENCE. I FOCUS ON THE EFFICIENT MANAGEMENT OF DAILY OPERATIONS AND LEADING THE BUSINESS STRATEGY, OVERSEEING ALL FUNCTIONS AND ENSURING THE ACHIEVEMENT OF ESTABLISHED OBJECTIVES. I LOOK FORWARD TO CONTRIBUTING MY KNOWLEDGE TO THE LONG-TERM DEVELOPMENT OF A NEW CAREER.
- Removal/Installation of Flight Control Surfaces
- Adjustment and Rigging of Ailerons, Flaps, Slats, Spoilers, Elevators, Rudder, and Horizontal Stabilizer
- Control Cables Swagged
- Replace bushing and bearings of Control Surfaces
- Removal/Installation, Check, and Test of Flight Control Components
- Removal/Installation, Adjustment, and Test of Brakes System
- Removal/Installation and Test of Landing Gears
- Removal/Installation of Horizontal and Vertical Stabilizer
- Removal/Installation of Auxiliary Power Unit
- Removal/Installation, Check, and Test of Hydraulic systems Components
- Removal/Installation, Check, and Test of System Fuel Components
- Removal/Installation, Check, and Test of System Air Conditioning Components.
- Removal/Installation of Flight Control Surfaces
- Adjustment and Rigging of Ailerons, Flaps, Slats, Spoilers, Elevators, Rudder, and Horizontal Stabilizer
- Control Cables Swagged
- Weight and Balance of Control Surfaces
- Replace bushing and bearings of Control Surfaces
- Troubleshooting
- Removal/Installation, Check, and Test of Flight Control Components
- Removal/Installation, Adjustment, and Test of Brakes System
- Removal/Installation and Test of Landing Gears
- Removal/Installation of Horizontal and Vertical Stabilizer
- Removal/Installation of Engine CFM56-7B and LEAP-1B
- Removal/Installation of Auxiliary Power Unit
- Removal/Installation, Check, and Test of Hydraulic systems Components
- Removal/Installation, Check, and Test of System Fuel Components
- Removal/Installation, Check, and Test of System Air Conditioning Components.