I am a self-motivated, dynamic, young, energetic, ambitious and hard-working person seeking for a challenging job where I can apply my knowledge and experience to do something innovative and creative and that gives me mental satisfaction and develops myself for upcoming challenging world.
Dedicated professional skillful in sample collection, data recording and instrument calibration. Resourceful and adaptable individual with extensive experience developing and conducting experiments to document results for studies. Comfortable handling complex issues, meeting strict deadlines and adjusting to rapidly changing conditions.
Perform a walkthrough of the compressor, system, and test loop to ensure complete and proper assembly.
Compressor
> Mechanical assembly
> Hydraulic lines
> Cooling lines
System:
• Piping and instruments match the P&ID (including the test loop).
• Connections are tight.
• Promoted a safe working environment by following established safety guidelines and protocols during all testing activities.
• In-line check valves are installed in the correct direction.
• The electrical system and connections have been verified by authorized electrical personnel, and the appropriate lockouts have been removed.
• Electrical feed is locked out/tagged out with a Test Technician Lock.
• The machine is mounted securely to the floor and is stable.
• Head(s) and crankcase(s) are filled with the proper oil.
• Flywheel(s) rotate freely by hand two revolutions in the proper direction.
• Belt guard(s) are securely installed.
• All necessary cooling connections are made and the system is filled.
• No loose parts or tools are left on the machine.
• Repaired faults, reassembled products, and completed additional tests.
Instrument air is connected, and AOVs are in the proper position.
• Check for proper system operation by applying low-pressure nitrogen or clean, dry shop air to the supply (suction) inlet; flow should be noticed coming out of the system discharge port. If no flow is detected, repair the cause of obstruction.
• Testing instruments (gauges, flow meter, etc.) have been calibrated and are not due within 14 days.
• Attach the test loop to the machine, and ensure the connections are secure.
• Perform gross leak testing and repair using nitrogen.
• Vacuum system.
• Introduce testing gas, and perform the flow meter zeroing procedure.
• Developed and implemented test procedures to enhance efficiency and accuracy in testing processes.
Knit Wear Textile Group Of Industries, Chashara, Narayangonj, Bangladesh, 6 months
Cooperative Society, 02/01/13, Daffodil Int. University